Project:Installation of VRF and ventilation technology on the 3rd floor
Construction time:4 months Place:Sulzbach
Technology:Cooling capacity: overall 73 kWMake: Sanyo
Project:Partial air conditioning (cooling) of the "Euranis" production hallConstruction time:6 monthsPlace:BlieskastelTechnology:Refrigeration technology from AirwellCooling capacity: 700 kW