Electrical industry

Client:
Hydac Electronic GmbH

 

Project:
Installation of VRF and ventilation technology on the 3rd floor

 

Construction time:
4 months
 
Place:
Sulzbach

 

Technology:
Cooling capacity: overall 73 kW
Make: Sanyo

 

 

Client:
Hager Electro GmbH & Co. KG

 

Project:
Partial air conditioning (cooling) of the "Euranis" production hall

Construction time:
6 months

Place:
Blieskastel

Technology:
Refrigeration technology from Airwell
Cooling capacity: 700 kW