Office & administration buildings

Client: Merck KG

 

Project:

Air conditioning for an office building

 

Construction time:

12 months

 

Place:

Darmstadt

 

Technology:

VRF refrigeration technology from Daikin with a total of 452 units installed inside the building and approx. 8 km of refrigerant pipes

Cooling capacity: 400 kW

 

 

 

 

Client:
DB Saar-Pfalz Bus GmbH

 

Project:
Conversion and renovation of headquarters at the main railway station
("RSW-Tower")

 

Place:
Saarbrücken

 

Our service:
Klima Becker Anlagenbau GmbH worked as the general
contractor in this case and was responsible
for the following lots:

  • Interior work
  • Wood work/carpentry
  • Floor coverings
  • Ceilings
  • Fire protection
  • Ventilation
  • Heating
  • Sanitary systems
  • Sprinklers
  • Hazard alert system
  • Electrics

 

The building concerned is a very sophisticated
piece of architecture since the actual
building is suspended in a steel
construction.

 

Client:
Aldi Bous GmbH & Co. KG

 

Project:
Installation of a cold water and ventilation system in a new administration building

 

Construction time:
8 months
 
Place:
Bous

 

Technology:
Cooling capacity: 250 kW

Make: Climaveneta, HTE

 

Client:
Preisler Herskovits

 

Project:
Installation of air-conditioning technology for the main building

 

Construction time:
5 months
 
Place:
Frankfurt am Main

 

Technology:
Cooling capacity: 280 kW (VRF)
Make: Daikin

 

Client:
Technischer Überwachungsverein Saarland e.V.

 

Project:
Addition of another floor to the laboratory building - ventilation technology

 

Construction time:
6 months
 
Place:
Sulzbach

 

Technology:
Ventilation technology with heat recuperation
Heating capacity: 35 kW
Air flow: 6,000 m³/h

Make: Howatherm